WESLEY CHAPEL, Fla. – The southbound I-75 Exit 275 ramp to SR 56 may be closed between 10 p.m. Wednesday, August 24, and 5 a.m. Thursday, August 25, weather permitting.
Detour Route to SR 56: Use Exit 279 to SR 54/CR 54. At the bottom of the ramp, turn left and go east on SR 54. Turn right onto SR 581 (Bruce B. Downs Boulevard) and go south to SR 56.
This project has reconfigured the I-75 / SR 56 interchange between CR 54 and Cypress Ridge Boulevard in Pasco County. The existing diamond interchange has been modified and converted to a diverging diamond interchange (DDI).
The main change was to diverge (cross) SR 56 traffic to the left side of the road through the interchange, and then cross vehicles back over to the right side of the road on the opposite side of the interchange. The improvements will help to alleviate traffic congestion at this interchange to reduce travel time for motorists in this rapidly growing area.
Visit Tampafp.com for Politics, Tampa Area Local News, Sports, and National Headlines. Support journalism by clicking here to our GiveSendGo or sign up for our free newsletter by clicking here.
Android Users, Click Here To Download The Free Press App And Never Miss A Story. Follow Us On Facebook Here Or Twitter Here.
Copyright 2022 The Free Press, LLC, tampafp.com. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.