An around-the-clock detour of Morris Bridge Road is scheduled to begin after 12 a.m. on Saturday, September 17, 2022.

Morris Bridge Road Has Reopened At SR-54

An around-the-clock detour of Morris Bridge Road has been completed. This detour began Saturday, September 17, and ended Wednesday, Sept. 21.

WESELY CHAPEL, Fla. – An around-the-clock detour of Morris Bridge Road has been completed. This detour began Saturday, September 17, and ended Wednesday, Sept. 21.

All traffic movements are now open at the Morris Bridge Road / SR 54 intersection.

This closure/detour was necessary for the contractor to reconstruct the southern side of the intersection of SR 54 and Morris Bridge Road.

In the news: State Of Florida, DeSantis Sued Over Migrant Flight To Martha’s Vineyard

This project is widening the existing two-lane road to a four-lane highway with medians. A sidewalk will be built on the north side of the road and a 10-foot wide multi-use trail will be built on the south side.

The sidewalk and trail will run the entire length of the project, from east of Curley Road to east of the Morris Bridge Road / Eiland Boulevard intersection.

Visit Tampafp.com for PoliticsSports, and National Headlines. Support journalism by clicking here to our GiveSendGo or sign up for our free newsletter by clicking here

Android Users, Click Here To Download The Free Press App And Never Miss A Story. Follow Us On Facebook Here Or Twitter Here.

Copyright 2022 The Free Press, LLC, tampafp.com. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Login To Facebook To Comment